1107 Manufacture of soft drinks; production of mineral waters and other bottled waters


Corresponding CPA codes

  • 11.07.1 Mineral waters and soft drinks
  • 11.07.11 Mineral waters and aerated waters, not sweetened nor flavoured
  • 11.07.19 Other non alcoholic beverages
  • 11.07.9 Sub-contracted operations as part of manufacturing of mineral waters and soft drinks
  • 11.07.99 Sub-contracted operations as part of manufacturing of mineral waters and soft drinks

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008