-
-
-
-
-
1412 Manufacture of workwear
-
-
-
-
Corresponding CPA codes
- 14.12.1 Men's workwear
- 14.12.11 Men's ensembles, jackets and blazers, industrial and occupational
- 14.12.12 Men's trousers, bib and brace overalls, breeches and shorts, industrial and occupational
- 14.12.2 Women's workwear
- 14.12.21 Women' s ensembles, jackets and blazers, industrial and occupational
- 14.12.22 Women's trousers, bib and brace overalls, breeches and sorts, industrial and occupational
- 14.12.3 Other workwear
- 14.12.30 Other workwear
- 14.12.9 Sub-contracted operations as part of manufacturing of workwear
- 14.12.99 Sub-contracted operations as part of manufacturing of workwear
Codification rules
Priority in case of multiple activities
If production, repair and sales activities are carried out, the priority is as follows :
- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority
Outsourced activities (outsourcing)
There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :
For a construction enterprise:
• Part of the construction activities, classification: construction - section F
Further information:
- Introduction to NOGA 2008