1412 Manufacture of workwear


Corresponding CPA codes

  • 14.12.1 Men's workwear
  • 14.12.11 Men's ensembles, jackets and blazers, industrial and occupational
  • 14.12.12 Men's trousers, bib and brace overalls, breeches and shorts, industrial and occupational
  • 14.12.2 Women's workwear
  • 14.12.21 Women' s ensembles, jackets and blazers, industrial and occupational
  • 14.12.22 Women's trousers, bib and brace overalls, breeches and sorts, industrial and occupational
  • 14.12.3 Other workwear
  • 14.12.30 Other workwear
  • 14.12.9 Sub-contracted operations as part of manufacturing of workwear
  • 14.12.99 Sub-contracted operations as part of manufacturing of workwear

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008