-
-
-
-
-
2051 Manufacture of explosives
-
-
-
-
Corresponding CPA codes
- 20.51.1 Prepared explosives; safety fuses; percussion or detonating gaps; igniters; electric detonators; fireworks
- 20.51.11 Propellant powders and prepared explosives
- 20.51.12 Safety fuses; detonating fuses; caps; igniters; electric detonators
- 20.51.13 Fireworks
-
20.51.14 Signalling flares, rain rockets, fog signals and other pyrotechnic articles, excluding fireworks
This subcategory excludes:
- fireworks, see 20.51.13
- 20.51.2 Matches
- 20.51.20 Matches
- 20.51.9 Sub-contracted operations as part of manufacturing of explosives
- 20.51.99 Sub-contracted operations as part of manufacturing of explosives
Codification rules
Priority in case of multiple activities
If production, repair and sales activities are carried out, the priority is as follows :
- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority
Outsourced activities (outsourcing)
There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :
For a construction enterprise:
• Part of the construction activities, classification: construction - section F
Further information:
- Introduction to NOGA 2008