2343 Manufacture of ceramic insulators and insulating fittings


Corresponding CPA codes

  • 23.43.1 Electrical insulators of ceramics; insulating fittings, for electrical machines, appliances or equipment, of ceramics
  • 23.43.10 Electrical insulators of ceramics; insulating fittings, for electrical machines, appliances or equipment, of ceramics
  • 23.43.9 Sub-contracted operations as part of manufacturing of ceramic insulators and insulating fittings
  • 23.43.99 Sub-contracted operations as part of manufacturing of ceramic insulators and insulating fittings

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008