2352 Manufacture of lime and plaster


Corresponding CPA codes

  • 23.52.1 Quicklime, slaked lime and hydraulic lime
  • 23.52.10 Quicklime, slaked lime and hydraulic lime
  • 23.52.2 Plaster
  • 23.52.20 Plaster
  • 23.52.3 Calcined or agglomerated dolomite
  • 23.52.30 Calcined or agglomerated dolomite
  • 23.52.9 Sub-contracted operations as part of manufacturing of lime and plaster
  • 23.52.99 Sub-contracted operations as part of manufacturing of lime and plaster

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008