2431 Cold drawing of bars


Corresponding CPA codes

  • 24.31.1 Cold drawn bars and solid profiles of non alloy steel
  • 24.31.10 Cold drawn bars and solid profiles of non alloy steel
  • 24.31.2 Cold drawn bars and solid profiles of alloy steel, other than stainless steel
  • 24.31.20 Cold drawn bars and solid profiles of alloy steel, other than stainless steel
  • 24.31.3 Cold drawn bars and solid profiles of stainless steel
  • 24.31.30 Cold drawn bars and solid profiles of stainless steel
  • 24.31.9 Sub-contracted operations as part of manufacturing of cold drawn bars
  • 24.31.99 Sub-contracted operations as part of manufacturing of cold drawn bars

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008