2432 Cold rolling of narrow strip


Corresponding CPA codes

  • 24.32.1 Flat cold rolled steel products, uncoated, of a width of < 600 mm
  • 24.32.10 Flat cold rolled steel products, uncoated, of a width of < 600 mm
  • 24.32.2 Flat cold rolled steel products, clad, plated or coated, of a width of < 600 mm
  • 24.32.20 Flat cold rolled steel products, clad, plated or coated, of a width of < 600 mm
  • 24.32.9 Sub-contracted operations as part of manufacturing of cold rolled narrow strip
  • 24.32.99 Sub-contracted operations as part of manufacturing of cold rolled narrow strip

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008