2512 Manufacture of doors and windows of metal
-
-
-
-
Corresponding CPA codes
- 25.12.1 Doors, windows and their frames and thresholds for doors, of metal
- 25.12.10 Doors, windows and their frames and thresholds for doors, of metal
- 25.12.9 Sub-contracted operations as part of manufacturing of doors and windows of metal
- 25.12.99 Sub-contracted operations as part of manufacturing of doors and windows of metal
Codification rules
Priority in case of multiple activities
If production, repair and sales activities are carried out, the priority is as follows :
- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority
Outsourced activities (outsourcing)
There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :
For a construction enterprise:
• Part of the construction activities, classification: construction - section F
Further information:
- Introduction to NOGA 2008