282200 Manufacture of lifting and handling equipment
-
-
-
-
-
This type includes:
- manufacture of hand-operated or power-driven lifting, handling, loading or unloading machinery:
- pulley tackle and hoists, winches, capstans and jacks
- derricks, cranes, mobile lifting frames, straddle carriers, etc.
- works trucks, whether or not fitted with lifting or handling equipment, whether or not self-propelled, of the type used in factories (including hand trucks and wheelbarrows)
- mechanical manipulators and industrial robots specifically designed for lifting, handling, loading or unloading
- manufacture of conveyors, cable cars, etc.
- manufacture of lifts, escalators and moving walkways
- manufacture of parts specialised for lifting and handling equipment
This type excludes:
- manufacture of industrial robots for multiple uses (see 289902)
- manufacture of continuous-action elevators and conveyors for underground use (see 289200)
- manufacture of mechanical shovels, excavators and shovel loaders (see 289200)
- manufacture of floating cranes, railway cranes, crane-lorries (see 301100, 302000)
- installation of lifts and elevators (see 432902)
cable-cars, aerial tramways; capstans; chair lifts; conveyors for the manufacturing; cranes, transporters; derrick, derricks, manufacturing; derricks; drilling rig, drilling rigs, manufacturing; elevators, lifts; funicular, cable way; hoists; lifting and handling equipment; lifting devices, manufacturing; lifting equipment, conveyors; lifting equipment, manufacturing; lifting, handling, loading or unloading equipment,manufacture; mechanical manipulators; mobile lifting frames; movable sidewalks; movable staircases; ski lifts, manufacturing; trolleys; unloading machinery and apparatuses; wagons of plant; wagons-horsemen; winches
Codification rules
Priority in case of multiple activities
If production, repair and sales activities are carried out, the priority is as follows :
- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority
Outsourced activities (outsourcing)
There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :
For a construction enterprise:
• Part of the construction activities, classification: construction - section F
Further information:
- Introduction to NOGA 2008