3220 Manufacture of musical instruments


Corresponding CPA codes

  • 32.20.1 Pianos, organs and other string and wind musical instruments, keyboards; metronomes, tuning forks; mechanisms for musical boxes
  • 32.20.11 Pianos and other keyboard stringed musical instruments
  • 32.20.12 Other string musical instruments
  • 32.20.13 Keyboard pipe organs, harmoniums and similar instruments; accordions and similar instruments; mouth organs; wind instruments
  • 32.20.14 Musical or keyboard instruments, the sound of which is produced, or must be amplified, electrically
  • 32.20.15 Other musical instruments
  • 32.20.16 Metronomes, tuning forks and pitch pipes; mechanisms for musical boxes; musical instrument strings
  • 32.20.2 Parts and accessories of musical instruments
  • 32.20.20 Parts and accessories of musical instruments
  • 32.20.9 Sub-contracted operations as part of manufacturing of musical instruments
  • 32.20.99 Sub-contracted operations as part of manufacturing of musical instruments

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008