-
-
-
-
-
1711 Manufacture of pulp
-
-
-
-
Corresponding CPA codes
- 17.11.1 Pulps of wood or other fibrous cellulosic material
- 17.11.11 Chemical wood pulp, dissolving grades
- 17.11.12 Chemical wood pulp, soda or sulphate, other than dissolving grades
- 17.11.13 Chemical wood pulp, sulphite, other than dissolving grades
- 17.11.14 Mechanical wood pulp; semi-chemical wood pulp; pulps of fibrous cellulosic material other than wood
- 17.11.9 Sub-contracted operations as part of manufacturing of pulp
- 17.11.99 Sub-contracted operations as part of manufacturing of pulp
Codification rules
Priority in case of multiple activities
If production, repair and sales activities are carried out, the priority is as follows :
- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority
Outsourced activities (outsourcing)
There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :
For a construction enterprise:
• Part of the construction activities, classification: construction - section F
Further information:
- Introduction to NOGA 2008