2222 Manufacture of plastic packing goods


Corresponding CPA codes

  • 22.22.1 Plastic packing goods
  • 22.22.11 Sacks and bags (including cones), of polymers of ethylene

    This subcategory also includes:

    • cones
  • 22.22.12 Sacks and bags (including cones), of other plastics than polymers of ethylene

    This subcategory also includes:

    • cones
  • 22.22.13 Boxes, cases, crates and similar articles of plastics
  • 22.22.14 Carboys, bottles, flasks and similar articles of plastics
  • 22.22.19 Other plastic packing goods
  • 22.22.9 Sub-contracted operations as part of manufacturing of plastic packing goods
  • 22.22.99 Sub-contracted operations as part of manufacturing of plastic packing goods

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008