-
-
-
-
-
-
222200 Manufacture of plastic packing goods
-
-
-
-
-
This type includes:
- manufacture of plastic articles for the packing of goods:
- plastic bags, sacks, containers, boxes, cases, carboys, bottles, etc.
This type excludes:
- manufacture of luggage and handbags of plastic (see 151200)
accessories of tubes and plastic pipes; articles in plastic subjects, packing; plastic bag, plastic sachet; plastic bags; plastic bottles; plastic carboys; plastic cases; plastic collector boxes; plastic containers
Codification rules
Priority in case of multiple activities
If production, repair and sales activities are carried out, the priority is as follows :
- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority
Outsourced activities (outsourcing)
There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :
For a construction enterprise:
• Part of the construction activities, classification: construction - section F
Further information:
- Introduction to NOGA 2008