-
-
-
-
-
2363 Manufacture of ready-mixed concrete
-
-
-
-
Corresponding CPA codes
- 23.63.1 Ready-mixed concrete
- 23.63.10 Ready-mixed concrete
- 23.63.9 Sub-contracted operations as part of manufacturing of ready-mixed concrete
- 23.63.99 Sub-contracted operations as part of manufacturing of ready-mixed concrete
Codification rules
Priority in case of multiple activities
If production, repair and sales activities are carried out, the priority is as follows :
- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority
Outsourced activities (outsourcing)
There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :
For a construction enterprise:
• Part of the construction activities, classification: construction - section F
Further information:
- Introduction to NOGA 2008