2365 Manufacture of fibre cement


Corresponding CPA codes

  • 23.65.1 Articles of fibre cement
  • 23.65.11 Boards, blocks and similar articles of vegetable fibre, straw or wood waste, agglomerated with mineral binders
  • 23.65.12 Articles of asbestos-cement, cellulose fibre-cement or the like
  • 23.65.9 Sub-contracted operations as part of manufacturing of articles of fibre cement
  • 23.65.99 Sub-contracted operations as part of manufacturing of articles of fibre cement

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008