2443 Lead, zinc and tin production


Corresponding CPA codes

  • 24.43.1 Lead, zinc and tin, unwrought
  • 24.43.11 Lead, unwrought
  • 24.43.12 Zinc, unwrought
  • 24.43.13 Tin, unwrought
  • 24.43.2 Semi-finished products of lead, zinc and tin or their alloys
  • 24.43.21 Lead plates, sheets, strip and foil; lead powders and flakes
  • 24.43.22 Zinc dust, powders and flakes
  • 24.43.23 Zinc bars, rods, profiles and wire; zinc plates, sheets, strip and foil
  • 24.43.24 Tin bars, rods, profiles and wire
  • 24.43.9 Sub-contracted operations as part of manufacturing of lead, zinc and tin
  • 24.43.99 Sub-contracted operations as part of manufacturing of lead, zinc and tin

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008