244300 Lead, zinc and tin production


This type includes:

  • production of lead, zinc and tin from ores
  • production of lead, zinc and tin from electrolytic refining of lead, zinc and tin waste and scrap
  • production of lead, zinc and tin alloys
  • semi-manufacturing of lead, zinc and tin

This type also includes:

  • manufacture of wire of these metals by drawing
  • production of tin foil

This type excludes:

alloys made of zinc; bars made of lead, zinc or tin; lead; lead alloys; lead half products; lead wires; profile sheets made of lead, zinc, tin; sheets made of aluminium, zinc, tin; tin; tubes made of lead, zinc or tin; zinc

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008

Corresponding NOGA2002 codes