-
-
-
-
-
-
244300 Lead, zinc and tin production
-
-
-
-
-
This type includes:
- production of lead, zinc and tin from ores
- production of lead, zinc and tin from electrolytic refining of lead, zinc and tin waste and scrap
- production of lead, zinc and tin alloys
- semi-manufacturing of lead, zinc and tin
This type also includes:
- manufacture of wire of these metals by drawing
- production of tin foil
This type excludes:
alloys made of zinc; bars made of lead, zinc or tin; lead; lead alloys; lead half products; lead wires; profile sheets made of lead, zinc, tin; sheets made of aluminium, zinc, tin; tin; tubes made of lead, zinc or tin; zinc
Codification rules
Priority in case of multiple activities
If production, repair and sales activities are carried out, the priority is as follows :
- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority
Outsourced activities (outsourcing)
There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :
For a construction enterprise:
• Part of the construction activities, classification: construction - section F
Further information:
- Introduction to NOGA 2008