-
-
-
-
-
-
265202 Manufacture and assembly of large clocks
-
-
-
-
-
This type includes:
- manufacture and assembly of master clocks, alarm clocks, pendulum clocks and similar clocks with movements other than small watches
- manufacture of time-recording equipment and equipment for measuring, recording and otherwise displaying intervals of time, e.g. parking meters, time clocks, etc.
alarm clocks and assembly; big watches; clockmaker, watchmaker; clocks for checking; master clocks and assembly; parking meters; time meters; time switches; watches
Codification rules
Priority in case of multiple activities
If production, repair and sales activities are carried out, the priority is as follows :
- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority
Outsourced activities (outsourcing)
There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :
For a construction enterprise:
• Part of the construction activities, classification: construction - section F
Further information:
- Introduction to NOGA 2008