265204 Manufacture of clock and watch fittings


This type includes:

  • manufacture of hands, cases, cages, wood cases, dials, bezels, bars, etc

This type excludes:

  • manufacture of non-metal watch bands (textile, leather, plastic) (see 151200)
  • manufacture of watch bands of precious metal (see 321202)
  • manufacture of watch bands of non-precious metal (see 321300)
  • manufacture of watch glasses (see 231900, 321201)

bars of clock; covering of watches, pointers, boxes; crimping; pointers; polishing of watches; quadrants; wood cases of clock

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008

Corresponding NOGA2002 codes