2814 Manufacture of other taps and valves


Corresponding CPA codes

  • 28.14.1 Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like
  • 28.14.11 Pressure-reducing, control, check and safety valves
  • 28.14.12 Taps, cocks, valves for sinks, wash basins, bidets, water cisterns bath and similar fixtures; central heating radiator valves
  • 28.14.13 Process control valves, gate valves, globe valves and other valves
  • 28.14.2 Parts of taps and valves and similar articles
  • 28.14.20 Parts of taps and valves and similar articles
  • 28.14.9 Sub-contracted operations as part of manufacturing of other taps and valves
  • 28.14.99 Sub-contracted operations as part of manufacturing of other taps and valves

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008