332000 Installation of industrial machinery and equipment


This type includes the specialised installation of machinery. However, the installation of equipment that forms an integral part of buildings or similar structures, such as installation of escalators, electrical wiring, burglar alarm systems or air-conditioning systems, is classified as construction.

This type includes:

  • installation of industrial machinery in industrial plant
  • assembling of industrial process control equipment
  • installation of other industrial equipment, e.g.:
  • communications equipment
  • mainframe or similar computers
  • irradiation and electromedical equipment, etc.
  • dismantling large-scale machinery and equipment
  • activities of millwrights
  • machine rigging
  • installation of bowling alley equipment

This type excludes:

  • installation of elevators, escalators, automated doors, vacuum cleaning systems, etc. (see 432902)
  • installation of doors, staircases, shop fittings, furniture, etc. (see 433200)
  • installation (setting-up) of personal computers (see 620900)

bowling alley equipment, Installation; bowling alleys, installation; bowling alleys, montage, installation; controlling equipment; irradiation and electromedical equipment; mainframe and similar computers; metal constructions, home-made; millwrights, activities

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information: