1082 Manufacture of cocoa, chocolate and sugar confectionery


Corresponding CPA codes

  • 10.82.1 Cocoa paste, whether or not defatted, cocoa butter, fat and oil, cocoa powder
  • 10.82.11 Cocoa paste, whether or not defatted
  • 10.82.12 Cocoa butter, fat and oil
  • 10.82.13 Cocoa powder, not containing added sugar or other sweetening matter
  • 10.82.14 Cocoa powder, containing added sugar or other sweetening matter
  • 10.82.2 Chocolate and sugar confectionery
  • 10.82.21 Chocolate and food preparations containing cocoa (except sweetened cocoa powder), in bulk forms

    This subcategory excludes:

    • cocoa powder, containing added sugar or other sweetening matter, see 10.82.14
  • 10.82.22 Chocolate and food preparations containing cocoa (except sweetened cocoa powder), other than in bulk forms

    This subcategory excludes:

    • cocoa powder, containing added sugar or other sweetening matter, see 10.82.14
  • 10.82.23 Sugar confectionery (including white chocolate), not containing cocoa

    This subcategory also includes:

    • white chocolate

    This subcategory excludes:

    • products containing synthetic sweeteners instead of sugar, see 10.89.19
  • 10.82.24 Fruit, nuts, fruit-peel and other parts of plants, preserved by sugar
  • 10.82.3 Cocoa shells, husks, skins and other cocoa waste
  • 10.82.30 Cocoa shells, husks, skins and other cocoa waste
  • 10.82.9 Sub-contracted operations as part of manufacturing of cocoa, chocolate and sugar confectionery
  • 10.82.99 Sub-contracted operations as part of manufacturing of cocoa, chocolate and sugar confectionery

Codification rules

Priority in case of multiple activities

If production, repair and sales activities are carried out, the priority is as follows :

- if production and sale: production takes priority
- if production and repair: production takes priority
- if repair and sale: repair takes priority

Outsourced activities (outsourcing)

There are several types of outsourcing, the enterprise may outsource::
• Part of a production process, classification: production
• All of a production process
o & owner of commodities, classification: production
o & non-owner of commodities, classification: section G, M or N :

For a construction enterprise:
• Part of the construction activities, classification: construction - section F

Further information:
- Introduction to NOGA 2008